Company profile
Product catalogue

Being isolated
Insert isolation plate
Double sealed off

Flap gate series
CS - II lose machine
Rotating mesh

Service commitment
Company performance
Special declaration
Information
Contact us

We have been committed to the professional product development, production and perfect service.

 

-Double sealed off
Right off

During my company in the right combination of development adjustment is double sealed off a renewal of series product, the draft is mainly used in thermal power plant boiler send powder pipe, played fast shut off, open, a regulation.
During my company with metal seal in the edge processing technology has unique technique.
Model: ZJD - I (Angle adjustment combination double sealed off)
ZJD - Ⅱ (right double sealed off gate),
ZJD - Ⅲ (series double sealed off right door group),
Driver: pneumatic electric manual
Driving time: 2 ~ 3 seconds, 3 ~ 4 seconds of 8-15 seconds
Features:
A, small volume, not to occupy a space.
Second, the structure is simple, switch is quick.
Third, adopt double doors, can install seal air, guarantee the strict.
Four, life and pipe simultaneously.

g3.jpg (34225 字节)  g10-1.jpg (25264 字节)  g4.jpg (23491 字节)  g8.jpg (59820 字节)